The connections between platforms, built to survive the next release rather than the next quarter.
We map the systems and processes you have now, agree the scope worth doing first, and put a phased plan against it.
We configure and build what is in scope, then wire it to the systems either side of it.
Data is migrated and reconciled against source totals, then tested and signed off before anyone relies on it.
We run the cutover, stabilise it, document what was built and hand it to your team.
Order of magnitude, not a quote. We will not price your programme before we have read your configuration, but you should be able to tell from these whether we are in your range before you spend a meeting finding out.
2 to 3 weeks
$8k to $15k
We go through the estate and the processes around it, and come back with the gaps, the options and what each one costs to close. You own the output whether or not we do the work.
8 to 16 weeks, phased
$40k to $200k, by platform
A defined piece of work with a fixed scope, a named team and a go-live date: a module, a migration, an integration set or a reporting layer. Where the work sits inside one country and one operating model, this is usually the right shape and the cheapest way to prove the platform.
9 to 18 months, phased in country waves
From $350k
A multi-entity or multi-country rollout run with programme governance: a global template designed once, then deployed in country waves with the localisation, statutory reporting and tax obligations sequenced ahead of each go-live. It comes with a programme lead, a template change process and a deployment lead per wave, because a rollout of this shape fails on governance long before it fails on configuration.
Rolling, minimum 3 months
$14k to $28k per month
Ongoing senior capacity that sits inside your programme under your delivery lead, extending and maintaining the estate alongside your own team.
Yes, and it is common. We catalogue what exists, document the contracts, and replace the ones that cannot be maintained. Working ones are left alone.
An upstream release changing a field, and nobody noticing until month end. Contract tests and alerting turn that into a ticket on the day rather than a discovery weeks later.
Whichever the estate justifies. Middleware earns its cost past a certain number of interfaces, and below it adds a layer for no return.
Bring the process that is breaking and we will tell you what it takes to fix it, including when the answer is not a project.